Preparing the workspace for 50ft hulls

Posted by on Oct 31, 2014 in Custom, News

We´ve built the two mounting jigs for the Coast 50 hulls. This allows us to work on the two 50 foot hulls simultaneously. They occupy quite a bit of space but there´s still room to continue working on the Gto39. First delivery of aluminium is about to arrive after being plasma cut. First step will be assembling the frames, then set them up in the specific position.

slipway_catamaran

slipway_catamaran_close