Positioning the frames of the Coast50

Positioning the frames of the Coast50

Posted by on Dec 20, 2014 in Custom, News

Once assembled, the frames are being set up on the jig. Correct positioning is crucial for the correct progress of the construction. Each frame has to be placed with millimetric precision. Click to enlarge images

Frame assembly, work in progress

Frame assembly, work in progress

Posted by on Dec 10, 2014 in Custom, News

Example of frames after assembly and welding. Notice the reinforcements  around all the internal perimeter. Pictured are frames nº 2 and frame number 4 .

Coast50 first delivery of material

Coast50 first delivery of material

Posted by on Nov 15, 2014 in Custom, News

First batch of cnc cut aluminum arrives in the yard. These are mainly 10mm parts for the frames for both port and starboard hulls. After sorting out the parts according to their reference number in the cutting files, the frames will be assembled and reinforced with T or L plates in order to comply with EC […]